See How a Tank Is Actually Made
Four minutes, no marketing: compound mixing, moulding, demoulding, galvanizing, trial assembly and container loading.
Two moulding halls
Panel moulding, frame fabrication and galvanizing under one roof.
Compression presses
1,200 t each; more than 500,000 panels per year.
Employees
Including 18 engineers and 6 installation crews.
From Compound to Commissioning
SMC compound preparation
Resin, filler, glass fibre and curing agent are mixed and matured under controlled temperature — the batch recipe determines strength and water safety.
Compression moulding
Compound is charged into polished steel moulds and pressed at 1,200 t / 145 °C. Every panel is barcol-tested and thickness-scanned at nine points.
Frame galvanizing
Base rails, columns and bracing are hot-dip galvanized to 70 µm after fabrication, so cut edges are protected too.
Pre-assembly & fit check
Panels and frames are trial-assembled at the factory, joint by joint, before palletising — mistakes are cheaper to find here than on site.
Packing & shipping
Panels are packed flat in reverse assembly order, banded and container-loaded with a packing list matched to the site sequence.
Site assembly & test
Our crew assembles, hydro-tests at 1.5× design head, disinfects and hands over with as-built drawings.
How We Prove It Is Right
Quality is not a certificate on the wall; it is a set of measurements taken at fixed points in the process.
- Incoming raw material tests — Resin viscosity, fibre tex and filler moisture verified per batch, with certificates retained for five years.
- In-process panel checks — Barcol hardness, gel-coat thickness and nine-point thickness scan on every moulded panel.
- Frame coating verification — Zinc thickness measured by magnetic gauge at six points per member; anything under 65 µm is re-dipped.
- Factory trial assembly — A full ring of panels and frame is bolted and checked for joint alignment before packing.
- Hydrostatic test on site — Filled to 1.5× design head, held 24 hours, all joints inspected; signed report issued.
- Water quality clearance — Tank disinfected with 50 ppm chlorine solution, flushed, and a sample tested where required.
Certified Quality, Recognized Worldwide
Want to Audit Us Before You Order?
Visit our plant, or ask for a live video walkthrough of the moulding line and the tank being assembled for your project.