Three Principles We Do Not Compromise
Engineer Before We Quote
No price without a layout. Every quotation is accompanied by a drawing, a load map and an installation sequence, because most tank failures begin as design failures.
Test Every Tank
Hydrostatic test at 1.5× design head before handover, on every single tank, with a signed report. No exceptions for small orders.
Stay After Delivery
Ten-year structural warranty, spare panels held in stock for a decade, and a technical line that answers in English within one working day.
Twenty-Two Years, One Product Line
Founded as a GRP fabrication workshop
Twelve people, one hand lay-up line, and a focus on corrosion-resistant process vessels for local chemical plants.
First SMC compression moulding press
Vertical integration into panel moulding gave us control over thickness, gel-coat cure and lead time.
Export programme launched
First container shipments to Southeast Asia and the Middle East; English-language documentation and CE marking introduced.
Hot-dip galvanizing line commissioned
In-house galvanizing eliminated the weakest link in the supply chain — frame corrosion.
NSF/ANSI 61 and WRAS approval
Potable water certification opened municipal and hospitality markets in 40+ countries.
Third moulding line online
Annual panel capacity up 30%, lead time for large tanks down to 25–30 days.
Certified Quality, Recognized Worldwide
Need a Water Tank Quote for Your Project?
Send us your capacity, dimensions or site drawings — our engineers will reply with a layout, load calculation and price within 24 hours.